FLC TWINS TOWER – 265 Cau Giay st – HN

FLC TWINS TOWER – 265 Cau Giay st – HN

11:48 - 21/07/2020

Contract value: 600.000 USD. Number of basement: 4. Duration: 6 months. Deepest point from surface: 15 m. Job: Earth work, concrete pile demolish, waste transportation

  • Contract value: 600.000 USD
  • Number of basement: 4
  • Duration: 6 months
  • Deepest point from surface: 15 m
  • Job: Earth work, concrete pile demolish, waste transportation